Our Process – From Quotation to Certification

At Master Glass Builder, we take pride in delivering a clear, thorough, and professional process — from initial enquiry to final certification. Whether we’re fabricating custom handrails, supplying balustrades, or delivering complete architectural metalwork packages, our team follows a structured approach to ensure quality, compliance, and efficiency at every step.

01

Quotation & Quantity Surveying

Every project begins with a detailed quantity survey based on supplied architectural drawings, tender documents, or site photographs. Our estimating team prepares:

  • A Bill of Quantities (BOQ) broken down by building areas, product types, and quantities
  • Marked-up drawings to confirm the extent of works and verify all balustrade and handrail zones
  • A detailed quotation that outlines the proposed product selections, finishes, compliance inclusions, and scope clarifications

This quotation ensures our clients have a clear understanding of product specifications, quantities, and exclusions before proceeding.

Section 1 image 1Section 1 image 2Section 1 image 3Section 1 image 4Section 1 image 5Section 1 image 6
02

Quotation Approval

To proceed with works, clients provide one of the following:

  • Formal instruction to proceed
  • Signed quotation
  • Letter of intent (LOI)
  • Work order or construction contract

Once approval is received, we lock in your project and allocate internal resources for scheduling, drafting, and delivery.

Section 2 image 1Section 2 image 2Section 2 image 3Section 2 image 4Section 2 image 5Section 2 image 6
03

Site Measure Booking

Our project team will contact the site supervisor or builder to schedule a site measure. This is coordinated to occur after structural works are complete and before internal finishes that affect balustrade fixings are installed.

Section 3 image 1Section 3 image 2Section 3 image 3Section 3 image 4Section 3 image 5Section 3 image 6
04

Onsite Measure

We conduct a precise onsite measure using laser tools and digital documentation. This ensures:

  • Millimetre-accurate dimensions
  • Confirmation of fixing points, setdowns, slab edges, and wall alignments
  • Capture of site-specific variables that affect fabrication & installation and methodology
Section 4 image 1Section 4 image 2Section 4 image 3Section 4 image 4Section 4 image 5Section 4 image 6
05

Shop Drawing Submission

Following site measure, our drafting team prepares comprehensive shop drawings, which include:

  • CAD layout plans and elevations
  • Setout and installation drawings
  • Fabrication and part drawings for brackets, posts, panels, and fixings
  • Finish schedules confirming colour, materials, and specifications

These drawings are submitted for client, architect, or builder review and approval before fabrication begins.

Section 5 image 1Section 5 image 2Section 5 image 3Section 5 image 4Section 5 image 5Section 5 image 6
06

Fabrication

Upon drawing approval, our in-house team begins fabrication of all balustrade and handrail components. This includes:

  • Cutting, rolling, and welding of metalwork
  • Integration of glass, timber, or feature materials
  • Surface finishing (e.g. powdercoating, patina, polishing)
  • Assembly and pre-delivery quality checks

All fabrication is carried out under strict quality control, ensuring compliance with Australian Standards and project documentation.

Section 6 image 1Section 6 image 2Section 6 image 3Section 6 image 4Section 6 image 5Section 6 image 6
07

Installation

Our experienced installation team delivers and installs the completed systems on-site. Installation is coordinated to minimise disruption and adhere to project timelines. Key aspects include:

Upon drawing approval, our in-house team begins fabrication of all balustrade and handrail components. This includes:

  • Safe and secure fixing to approved substrates
  • Coordination with other trades (e.g. waterproofers, tilers)
  • Alignment with architectural details and final finishes
Section 7 image 1Section 7 image 2Section 7 image 3Section 7 image 4Section 7 image 5Section 7 image 6
08

Works Completed

Once all components are installed, we ensure every detail meets scope and project expectations

Section 8 image 1Section 8 image 2Section 8 image 3Section 8 image 4Section 8 image 5Section 8 image 6
09

Certification & Engineering

At completion, we issue all necessary certification and documentation, including:

  • Engineering design certifications (Where applicable and required)
  • Compliance declarations in line with NCC and Australian Standards
  • Installation conformance records
  • Maintenance guides to support long-term performance

This ensures the balustrade or handrail installation can be signed off for occupancy or final building approval.

Section 9 image 1Section 9 image 2Section 9 image 3Section 9 image 4Section 9 image 5Section 9 image 6
10

Why Our Signature Process Works

Our proven step-by-step process ensures that every Master Glass Builder project is:

  • Accurate – Detailed surveys and drawings ensure a perfect fit
  • Compliant – Certified engineering and standards-aligned finishes
  • Efficient – Structured stages streamline scheduling and delivery
  • Transparent – Every step is documented and communicated
  • Customisable – Designed to meet the specific needs of your site and vision